POLICE HEADQUARTERS

Emergency Generator Replacement

 

The project involved remove, replace and relocation of the Emergency Standby Generator at the Police Headquarters. The facility remained open and fully operational through the entirety of the project. No power or critical systems interruptions were allowed. All personnel was background checked and badged. The logistics for the removal of the existing generator from the building's basement required utilizing a vertical outside air shaft through the roof and crane removal from the basement. The project included work scopes from CSI Division codes 1 thru 11, 15 & 16.